When Your Dubai Developer Warranty Ends: What to Put in Your First AMC

Residential apartment buildings in Dubai with a UAE flag on the facade

Post Details

November 27, 2026
5 min read
GeeM

Quick answer: In Dubai, the developer of a jointly owned property stays liable for one year from handover for defective installations, such as mechanical, electrical, sanitary and sewerage works, and for ten years from the completion certificate for structural defects. When the one-year window closes, those repairs become your cost. Build your first annual maintenance contract (AMC) from the systems you have and the defects your home showed in year one.

General information, not legal advice. Check your Sale and Purchase Agreement (SPA) and handover documents for the exact terms that apply to your home.

If you took the keys to a new apartment, townhouse or villa in the last year, this guide shows what the developer still owes you, what to log before the warranty runs out, and what to put in your first AMC. For the wider first-year checklist, see our guide for new homeowners in Dubai.

An annual maintenance contract (AMC) is a yearly agreement for planned servicing and breakdown call-outs on a home's AC, plumbing and electrical systems, against an agreed asset list.

What the developer warranty in Dubai actually covers

The developer warranty in Dubai has two windows: one year from handover for defective installations, and ten years from the completion certificate for structural defects. Both come from Dubai Law No. (6) of 2019 on jointly owned property, Article 40.

The official text of Law No. (6) of 2019 says:

  • Structure, ten years: the developer "will remain liable, for a period of ten (10) years from the date of obtaining the completion certificate … to remedy or rectify any defects in the structural parts of the Jointly Owned Real Property" (Article 40(a)).
  • Installations, one year: the developer "will remain liable, for a period of one (1) year from the date of handover of the Unit to the Owner, for repairing or replacing defective installations … These include mechanical and electrical works, sanitary and sewerage installations, and similar installations" (Article 40(b)).
  • Other rights stay: nothing in the law "may preclude or prejudice any rights or warranties granted to Owners as against Developers pursuant to any other legislation" (Article 40(c)).
  • No contracting out: an agreement made after the law came into force that "contradicts, in any way, the provisions of this Article will be deemed null and void" (Article 40(d)).

This law applies to jointly owned property. That covers most apartments and many community villas and townhouses, but not necessarily every villa, so check your SPA. Federal civil law adds a separate ten-year liability for contractors and engineers for collapse and structural-safety defects.

The law does not list finishes such as paint, tiles or joinery as installations, does not set a deadline for fixing snags, and does not make routine servicing the developer's job. Finishes and any extra item warranties come from your SPA and handover schedule.

Find your two dates before anything else

Find your handover date and your building's completion certificate date first, because they decide when each warranty window ends.

  • Handover date: usually on your handover letter or key handover form. Under Article 40(b), this starts the one-year installations window.
  • Completion certificate date: this starts the ten-year structural window. If an owner did not take possession of the unit, the one-year window also runs from this date instead of from handover.
  • Your SPA and handover schedule: these may list separate warranties for items such as appliances, AC equipment, water heaters or kitchen fittings, each with its own dates. Write them down.

Then put a reminder in your calendar two months before the one-year date. That two-month lead is a planning suggestion, not a legal rule. It gives you time to inspect the home, list defects, send them to the developer in writing and follow up while the window is still open.

Snagging in Dubai: the list that protects your warranty

Snagging is the process of listing everything in a new home that is defective, badly finished, incomplete or not built as contracted, so the developer can fix it under warranty. In Dubai, most owners snag at handover, and a second check before the one-year date is just as important.

A snag can be a leaking trap, an AC unit that will not hold temperature, a dead socket, a door that will not close or cracked tiles. Whether you do it yourself or hire a snagging inspection specialist, the list protects you best when it is:

  • Dated, so it is clear the fault appeared inside the warranty window.
  • Photographed, with the room and item named in each photo.
  • Sent in writing, by email or through the developer's own portal, rather than raised in a site conversation.
  • Acknowledged, with a reference number or written reply you can point to later.

Do a re-snag in the last two months of the first year. Some faults only show after a summer of heavy AC use: slow condensate drains, damp patches, weak pressure, tripping circuits. A thermographic inspection can help find hidden heat or moisture problems behind walls and ceilings before you send your final list.

Keep everything in one folder. That written defect list becomes the starting point for your first AMC.

Warranty repairs vs routine servicing: what was always yours

The developer warranty covers defects, not routine servicing. Cleaning AC filters, coils and drain lines, cleaning water tanks and checking pumps was always the owner's job, even in year one.

This is where many new owners get caught. An AC that cools poorly because its filter has not been cleaned in nine months is not a defect, and a condensate line blocked by dust is usually a maintenance issue. If the fault came from missing upkeep, the repair may not be covered.

Two practical points follow:

  1. Read your own handover pack. Some developers ask owners to keep a maintenance contract in place from day one, and their handover documents link this to the defects liability period. Others say nothing. Your pack is the only document that tells you which applies to you.
  2. Defects still go to the developer. Do not pay a maintenance company to fix a defect that is still under warranty. Report it to the developer in writing. Routine AC servicing and checks can still happen alongside, and the visit records help show that a fault is a defect and not neglect.

For water tanks there is an official benchmark. Dubai Municipality's drinking-water guideline says all water tanks "should be emptied, cleaned, and disinfected … at least twice a year". That is upkeep, not a warranty item.

What lands on you when the warranty ends

Once the one-year window closes, repairs to your AC, plumbing, electrical and drainage installations become your cost, unless the fault is structural or caused by someone else.

The usual year-two costs are:

  • AC: compressor, fan motor and thermostat faults, refrigerant leaks, blocked drain lines and poor balance between rooms.
  • Plumbing and drainage: leaking mixers and traps, water heater faults, slow drains and low pressure. See our plumbing services.
  • Electrical: tripping breakers, failed sockets and switches, and faults at the distribution board. See our electrical services.
  • Systems nobody set a service interval for: booster pumps and pressure vessels, water tanks and, in villas, irrigation controllers, pool plant and water treatment.

Some faults may still be someone else's to fix:

  • Structural defects stay with the developer for ten years from the completion certificate.
  • A leak from the unit above is usually that owner's responsibility to trace and repair.
  • Common parts, such as risers, shared pipework and building plant in a tower, sit with the building's management, not with you.

Report these in writing to the right party before paying for a repair.

What to put in your first AMC

Your first AMC should be built from your home's own asset list and its year-one defect log, so the contract covers the systems you actually have and the faults your home has already shown.

Use this checklist when you ask for quotes:

  1. An asset list. Count your AC units and note their type (split, ducted, fan-coil on a central system). List water heaters, pumps, pressure vessels and tanks. For villas, add irrigation, pool plant and water treatment.
  2. Your year-one defect log. Share it with the provider. Repeat faults, such as a drain that blocked twice, tell them where to look first on each visit.
  3. Scheduled visits. For villas, GeeM plans set the scheduled visits by tier: Basic 3, Standard 4, Premium 6 or Ultra 12 a year. For apartments, ask each provider how many visits the plan includes and what each visit covers.
  4. Call-outs. Check whether call-outs are unlimited or capped, and whether "unlimited" means every fault or only a listed set of emergencies or trades.
  5. Labour and parts. Ask whether labour is included on call-outs and how parts are handled: included, discounted or quoted separately. Major parts such as compressors, motors, control boards, water heaters and pumps are usually quoted.
  6. Extra systems. Pool, irrigation, pump and tank maintenance are available as add-ons. Generators and home lifts need specialist contracts. Our guide to villa AMC add-ons explains what to expect.
  7. The VAT-inclusive total. Ask for one figure with VAT included, so quotes are easy to compare.
  8. Response time and repair time. Response time is not repair time. Ask both how quickly someone arrives and how faults are followed through to a fix.
  9. Records. Ask for a written report after each visit. In year two, those records help with any later claim and with resale.
  10. Exclusions. Read what is not covered: structural work, common parts, appliances, renovation and misuse are common exclusions.

For the full scope, use our AMC scope of work checklist, and read what to check before signing an AMC contract. If you own an apartment, our guide to apartment AMCs vs service charges explains what your service charge already pays for and what it does not.

If your developer offers a maintenance contract at handover, compare it with independent quotes on the same scope before you sign.

What a first AMC costs in Dubai

What you pay for a first AMC depends mainly on property size and type, the number of AC units, any extra systems and how parts are handled. GeeM AMCs are quoted by property size.

Advertised "from" prices across the market usually describe the smallest unit, a studio or the smallest villa, with basic cover. A real quote moves with:

  • Size: bedrooms and built-up area.
  • AC load: how many units, and whether the home is on a central system.
  • Extra systems: Pool, irrigation, pump and tank maintenance are available as add-ons.
  • Cover level: number of scheduled visits, call-out rules and how parts are handled.
  • VAT: some prices include it and some do not.

That is why the asset list matters. Ask every provider to quote on the same list, with VAT included, and compare what each includes, not only the headline figure. For an overview of plans, see our annual maintenance contract in Dubai page.

How GeeM sets up a first AMC for a new home

GeeM builds a first AMC around your home's systems, gives you one team and one number to call, and quotes by property size.

What you get with a GeeM AMC:

  • Unlimited call-outs, with labour included.
  • First-Time Fix.
  • 24/7 support for AMC clients.
  • Scheduled visits for villas by tier: Basic 3, Standard 4, Premium 6 or Ultra 12 a year.
  • Pool, irrigation, pump and tank maintenance are available as add-ons. Pest control is optional.
  • A team with 20+ years of expertise in Dubai: 50+ technicians, 20+ vehicles, 25k+ jobs completed and 15k+ happy clients. GeeM is insured, UCS-GAC certified and ISO 9001-certified.

Bring your handover date, your asset list and your year-one defect log, and we will scope a plan that starts where your developer warranty stops.

General information, not legal advice. Check your SPA and handover documents for the exact terms that apply to your home.

Frequently asked questions

How long is the developer warranty on a new property in Dubai?
Plus Faq

For jointly owned property, Dubai Law No. (6) of 2019, Article 40, makes the developer liable for one year from handover for defective installations, such as mechanical, electrical, sanitary and sewerage installations, and for ten years from the completion certificate for structural defects. Your SPA may add separate warranties for some items.

Does the one-year warranty start at handover or at the completion certificate?
Plus Faq

Under Article 40(b), the one-year installations window starts on the date the unit is handed over to the owner. If the owner refrains from taking possession, it starts from the completion certificate date instead. Check your handover letter and SPA for your exact dates.

Do I need an AMC while my home is still under the developer warranty?
Plus Faq

Defects inside the warranty should go to the developer, not to a maintenance company. Routine servicing, such as AC filters, coils, drain lines and tank cleaning, is still the owner's job, and some developers' handover packs ask owners to keep a maintenance contract from day one. Read your own handover pack to see which applies to you.

What isn't covered by the developer warranty?
Plus Faq

The law does not cover routine servicing or wear and tear, and it does not list finishes such as paint, tiles or joinery as installations. Damage from misuse or missing upkeep is usually excluded. Finishes and extra item warranties depend on your SPA and handover schedule.

What should I do in the last two months before my warranty ends?
Plus Faq

Re-inspect the whole home, list every defect with dates and photos, and send the list to the developer in writing. Ask for a written acknowledgement or reference number and follow up until each item is fixed or answered.

What should my first AMC include after the warranty ends?
Plus Faq

It should cover the systems your home has: all AC units, plumbing and drainage, electrical and water heaters. Pool, irrigation, pump and tank maintenance are available as add-ons. Check scheduled visits, call-out rules, labour, parts, the VAT-inclusive total and visit reports.

How much does an AMC cost for a new apartment or villa in Dubai?
Plus Faq

It depends on property size and type, the number of AC units, extra systems, the cover level and how parts are handled. Advertised "from" prices usually describe the smallest home with basic cover. GeeM AMCs are quoted by property size; call 800 4336 or visit our annual maintenance contracts page for a quote.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Table of content

  • Extreme Heat and Overworking
  • Poor Maintenance and Dirty Filters
  • Incorrect Sizing of AC Units
  • Low Refrigerant Levels

Recent Posts

Residential apartment buildings in Dubai with a UAE flag on the facade
Annual Maintenance

When Your Dubai Developer Warranty Ends: What to Put in Your First AMC

What the one-year developer warranty in Dubai covers, what to log before it ends, and what your first AMC should include. Call 800 4336 for a quote.

Empty classroom with white desks and red chairs, ready for the next school term
Annual Maintenance

What an AMC for a Dubai School, Hospital or Medical Centre Should Cover

What a Dubai school, medical centre or hospital AMC should cover, what goes to specialists, and how to time visits. Get a facility AMC quote.

Glass and aluminium facades of high-rise towers in Dubai
Annual Maintenance

Building AMC Tenders in Dubai: How to Compare Proposals for a Tower or Facility

Compare building maintenance contract proposals in Dubai: put every bid on one scope, VAT and parts basis, then score each out of 100. Request a quote.

Ready to give your property the care it deserves?