Building AMC Tenders in Dubai: How to Compare Proposals for a Tower or Facility

Post Details
Quick answer: To compare building AMC proposals in Dubai, first put every bid on the same footing: one surveyed asset list, VAT-inclusive totals, the same approach to spare parts, the same operating hours and the same contract terms. Then score each bid against weighted criteria, such as scope, response, normalised price, compliance, terms and track record, and choose on the total score, not the lowest headline figure.
This guide is for building managers, owners association teams, facilities leads and landlords who already have several annual maintenance contract (AMC) proposals on the table for a tower or facility. It gives you one method for reading those bids side by side.
A building AMC (annual maintenance contract) is a yearly agreement under which one contractor carries out planned preventive maintenance and fault response for a building's shared systems, such as HVAC, electrical, plumbing, drainage and pumps, against an agreed asset list. It is also called a building maintenance contract or, in facilities terms, hard FM.
This article is general information, not legal advice. Where it mentions laws or official requirements, read the linked official text and take professional advice for your building.
Why building AMC proposals are hard to compare
Building AMC proposals rarely price the same thing. One bid may include a resident technician and a parts budget, another may exclude lifts and tank cleaning, and a third may assume office hours only. Until the scope is the same, the totals cannot be compared.
A building maintenance contract in Dubai is almost never sold from a price list. Whole-building work is quoted by property size after a site visit to confirm scope, because the number of AC units, pumps, tanks, boards and floors changes the price. That is why residential-style "building maintenance packages" do not translate to a tower.
In practice, the gaps between bids usually come from five places:
- Asset counts. For example, one bidder counts every fan coil unit on site while another prices from drawings or an estimate.
- Specialist systems. Lifts, fire systems, generators, BMS, CCTV and facade cleaning may be inside one bid and missing from the next.
- Site staffing. A shared mobile team, a part-time technician and a resident technician are very different costs.
- Spare parts. Labour-only, an agreed yearly parts budget, a parts cap or a parts discount all produce different totals.
- Hours and terms. A 24/7 operation needs more servicing than an office used five days a week, and contract terms vary on notice and takeover.
A lower bid is often a smaller scope. Your job is to find out which.
Start with one scope: the survey and asset register
A comparable tender starts with one asset register: every system in the building listed with its count, location and planned visit frequency, sent to every bidder. If bidders price their own lists, you will be comparing different buildings.
If your bids are already in and each uses its own list, build a master register from the most complete survey you received and ask every bidder to reprice against it in writing. Keep it simple: system, item, count, location, visits a year, and who maintains it.
What belongs in the register, and the questions an owners association should ask at the request stage, are covered in our guide to owners association AMCs in Dubai. For a template of the scope itself, see our AMC scope of work checklist. A detailed walk-through of plant rooms and shared systems is outside the scope of this guide.
Normalise the bids before you score them
Normalising means restating every bid on the same basis before any scoring: VAT included, the same asset list, the same parts approach, priced extras, the same operating hours and the same term. Only then do price differences tell you something real.
Use one sheet with a column per bidder and ask the same questions of each.
| Line | What to ask every bidder |
|---|---|
| VAT | Is the yearly total inclusive of 5% VAT? Please restate it VAT-inclusive. |
| Asset list | Have you priced exactly the master register? List any items you excluded or added. |
| Spare parts | Is it labour only, an agreed yearly parts budget at cost, a cap, or a discount? What happens above the limit? |
| Extras | Are tank cleaning, coil and duct cleaning, common-area pest control and handyman tasks included, priced separately or excluded? |
| Specialist systems | Which of lifts, fire systems, generators, BMS and CCTV are in your price, and which are left to separate contracts? |
| Site team | How many technicians, which trades, which hours and days, and is any of them resident? |
| Operating hours | Does the price assume office hours or a 24/7 building? |
| Term and notice | Contract length, notice period, takeover plan and how scope changes are priced. |
Get every answer in writing. Where a bidder cannot answer a line, record it as a gap.
A scoring sheet you can use (example weights out of 100)
Score each normalised bid out of 100 against six weighted criteria. The weights below are an example: your board, committee or management team should set its own before opening the bids, and apply them the same way to every bidder.
| Criterion | Example weight | What earns the points |
|---|---|---|
| Scope and asset coverage | 25 | Survey-based register; every system listed with count and visit frequency; specialist contracts named, with who manages them |
| Response and staffing | 20 | Written targets by priority for emergency and routine faults; helpdesk hours; site team, trades and hours; escalation contacts |
| Price on a normalised basis | 20 | VAT-inclusive total on the master scope; clear parts approach; extras priced |
| Compliance and records | 15 | Tank cleaning at the required frequency; evidence for fire and lift contractors; sample monthly report; licence and insurance |
| Contract terms | 10 | Term, notice, takeover plan, change control and an approval threshold for extra work |
| Track record | 10 | Similar buildings maintained, years in operation, references you can call |
How to run it:
- Score each criterion out of its weight, using written evidence only. Two people scoring separately is better than one.
- Shortlist the top two, send each the same clarifying questions in writing, and rescore if needed.
- Choose on scored value, and record why the winner won.
For price, a simple method is to give the lowest normalised total the full 20 points and score the others in proportion. This keeps price important without letting it decide the whole tender.
Response times and staffing: what to get in writing
Ask every bidder for written response targets by priority level, the hours their helpdesk runs, who is on site and when, and how a fault is escalated. Wording such as "fast response" or "priority service" without a definition should score low.
A useful structure is three or four priority levels, such as emergency (water leak, power loss, fire system fault), urgent, routine and planned. For each level, ask for the target to attend and to make safe, and whether results appear in the monthly report.
On staffing, ask for the trades covered, the number of technicians assigned, their hours, and how cover works at night and at weekends.
GeeM building contracts include 24/7 support, unlimited call-outs with labour included, and First-Time Fix. We do not publish one response time for every building; response terms are written into each surveyed proposal.
Specialist systems that usually sit beside the AMC
Lifts, fire systems, generators, BMS and facade cleaning are often maintained under separate specialist contracts. Score each bid on whether it names those systems, says who maintains them and explains who coordinates the specialists day to day.
Fire safety systems in the UAE are governed by the UAE Fire and Life Safety Code of Practice published by Dubai Civil Defence. Our article on fire safety maintenance in Dubai explains how those systems are usually serviced. Lifts are commonly kept on a contract with the manufacturer's specialist.
For a tender, ask: is each specialist system inside this bid or excluded; if excluded, who manages that contractor and chases their defects; and are specialist visits shown in the same monthly report?
A bid that silently leaves out a specialist system is not cheaper. It moves the cost back to you.
Compliance and records that should be in every bid
Every bid should show how it meets official maintenance requirements and what records you will receive. For water systems, Dubai Municipality's Legionella guideline sets minimum cleaning frequencies; check that each bid includes them or names who does the work.
The Dubai Municipality Technical Guidelines for Legionella Control in Water System say that all water storage tanks, water heaters (calorifiers) and water filters "must be emptied, cleaned and disinfected at least twice a year", that cooling water systems must be cleaned and disinfected "at least once every six (6) months", and that a risk assessment of water systems should be done "at least once a year". Score a bid down if tank cleaning is missing, priced vaguely or scheduled less often.
Dubai Law No. 3 of 2026 Concerning the Quality and Safety of Buildings says an owner must "perform periodic maintenance for any Building that has been constructed for less than twenty (20) years from the date of issuance of its Completion Certificate" (Article 9), and that for jointly owned buildings the Management Entity performs the owner's duties under the law (Article 10). Dated visit reports are the simplest record that maintenance happened.
Ask every bidder for:
- a sample monthly report, with planned visits done, faults logged, response times achieved and open defects;
- their trade licence and insurance details;
- how visit records and photos are stored and handed over at the end of the contract.
Jointly owned buildings: the three-tender rule for service-charge approval
For jointly owned buildings in Dubai, the Dubai Land Department's service-charge approval asks for evaluated tenders: the required documents include "the proposals and evaluating tenders of not less than 3 tenders for each service provider". A written scoring sheet is a practical way to show that evaluation.
The DLD service Request for Approval of Service and Usage Charges lists the documents needed, including copies of service and maintenance contracts. Its terms also state that "the companies providing services in joint ownership properties must be licensed in the Emirate of Dubai."
Service charges themselves are defined in Dubai Law No. 6 of 2019 as "the annual charges collected from Owners to cover the cost of management, operation, maintenance, and repair of Jointly Owned Real Property." The wider legal duties of associations and management entities are covered in our owners association AMC guide.
This requirement applies to DLD service-charge approval for jointly owned property. Other buildings can use the same scoring sheet as good practice.
Red flags in a building AMC proposal
The clearest warning signs are a bid with no survey, no asset list, an undefined "unlimited", unclear parts terms, no VAT statement, no sample report and specialist systems that are quietly excluded. Each one usually means cost or risk comes back to the building later.
Watch for:
- No site survey. A whole-building price without a visit is a guess.
- No asset list. If the bid does not say what it covers, you cannot hold the contractor to it.
- "Unlimited" with no definition. Ask whether it covers routine as well as emergency calls, and whether labour is included.
- Parts left vague. "Parts extra" without a budget, cap or approval process can double the real cost.
- No sample report. If they cannot show one, you may not get one.
- Vague response wording. No priority levels, no targets, no measurement.
- Specialist systems missing. Lifts, fire systems or tanks not mentioned at all.
Our checklist before signing an AMC contract covers the contract wording to check once you have a preferred bidder.
Next step: request a surveyed proposal
If you are running a building or facility tender, ask GeeM for a surveyed proposal priced against your asset register. Building contracts are quoted by property size and scope, under Enterprise, a custom B2B plan for services beyond Basic, Standard and Premium, so you can score us on the same basis as every other bidder.
GeeM has been maintaining Dubai properties since 2004, with 50+ technicians, 20+ vehicles, 25k+ jobs completed and 15k+ happy clients. We are insured and UCS-GAC certified. Our contracts include unlimited call-outs with labour included, First-Time Fix and 24/7 support, and pest control is offered. One contract, one team, one number.
See also our AMC for commercial spaces, common area maintenance and facility AMC pages.
Request a building AMC proposal, explore all our annual maintenance contracts, or call 800 4336.
Official texts checked 23 November 2026. This article is general information, not legal advice.
Frequently asked questions
Put every bid on the same basis first: one surveyed asset list, VAT-inclusive totals, the same parts approach, the same operating hours and the same terms. Then score each bid against weighted criteria such as scope, response, normalised price, compliance, terms and track record, and choose on the total score.
The price is set after a site visit to confirm scope. It depends on the asset list, the site team and its hours, the specialist systems included, the spare-parts approach and VAT. At GeeM, building AMCs are quoted by property size and scope.
No published per-square-foot benchmark for building AMCs was found in our research. Figures quoted per square foot in Dubai usually refer to service charges, which pay for much more than maintenance, so they should not be compared with an AMC bid.
For the Dubai Land Department's service-charge approval, the required documents include evaluated proposals from "not less than 3 tenders for each service provider." This is general information, not legal advice; check the DLD page and RERA's terms for your building.
Usually planned maintenance and fault response for HVAC, electrical, plumbing and drainage, minor civil work, a helpdesk and reports. Major parts, replacements, fit-out and structural work, and specialist systems such as lifts and fire systems are often outside it unless written in.
Ask for written targets for each priority level, from emergencies such as leaks or power loss to routine and planned work, plus helpdesk hours and how performance is reported. GeeM writes response terms into each surveyed proposal and offers 24/7 support.
Usually labour is included and major parts are not. Some contracts carry an agreed yearly parts budget, a cap or a discount, with anything beyond it quoted and approved first. Ask each bidder to explain this in writing.